Manufacturing
We don’t just design and engineer equipment solutions, we manufacture them as well. Our manufacturing capability is the backbone of the company. That means you can count on NATCO to deliver quality and reliability, on time and on budget.
Worldwide service with a regional manufacturing network. To get processing systems and equipment into the fields quicker, we provide a complete manufacturing network. With fabrication strategically located in the US Gulf Coast region, Canada, and the Middle East, we are ideally positioned to supply major producing areas with cost-competitive manufacturing, repair and services. Through our joint ventures and international affiliates, we can provide integrated solutions on time, and on budget anywhere in the world.
Because we understand manufacturing, we have better control of our delivery model. We are typically not at the mercy of third parties and other contractors, which means you can relax and feel confident in your choice of reliable NATCO equipment.
When you select NATCO, your production equipment will be designed and manufactured in one of our world-class manufacturing facilities. Our products are engineered for efficient fabrication through our shops. Project manufacturing managers maintain constant communication with engineering, estimating and procurement throughout the production phase of your equipment. This closeness between shop and engineering personnel helps to ensure that your project is delivered on time, on spec and on budget.
Our Manufacturing Facilities and Specifications
Casper, Wyoming, USA
- 19,200 ftM2 manufacturing area
- 10 acre yard
- Paint & Hydrotest capabilities
- ASME Div. 1 & 2 Code Construction
- Structural Construction
- Assembly & Instrumentation
- Warehousing & Shipping truck
Corpus Christi, Texas, USA
- 4,800 ft2 manufacturing area
- 1.80 acre yard
- Sandblast & Hydrotest capabilities
- ASME Div. 1 Code Construction
- Structural Construction
- Assembly & Instrumentation
- Warehousing & Shipping truck
Electra, Texas, USA
- 130,000 ft2 manufacturing area
- 45 acre yard
- Hydro Test capability
- Sandblast area
- Paint booth/building
- ASME Div. 1 & 2 Code Construction
- Structural construction
- Assembly & Instrumentation
- PWHT Furnace
- Warehousing & Shipping by truck
Farmington, New Mexico, USA
- 14,400 ft2 manufacturing area
- 10 acre yard
- Sandblast & Hydrotest capabilities
- ASME Div. 1 Code Construction
- Structural Construction
- Assembly & Instrumentation
- Warehousing & Shipping truck
Grand Junction, Colorado, USA
- 17,000 ft2 manufacturing area
- 7.65 acre yard
- Paint facilities
- Structural Construction
- Assembly & Instrumentation
- Warehousing & shipping truck/rail
NATCO Linco Measurement, Midland, Texas, USA
- 16,000 ft2 manufacturing area
- 4 acre yard
- Sandblast & Paint facilities
- ASME Div. 1 Code Construction
- Structural Construction
- Assembly & Instrumentation
- Warehousing & Shipping by truck
NATCO Linco Measurement, Odessa, Texas, USA
- 10,000 ft2 manufacturing area
- 10 acre yard
- Sandblast & Hydrotest capabilities
- Structural Construction
- Assembly & Instrumentation
- Warehousing & Shipping by truck
Magnolia, Texas, USA
- 32,590 ft2 Manufacturing area
- 10 acre yard
- Hydrotest capabilities
- ASME Div. 1 Code Construction
- Structural Construction
- Assembly & Instrumentation
- Warehousing & Shipping by truck
New Iberia, Louisiana, USA
- 85,548 ft2 Manufacturing Area
- 17.5 acre yard
- Sandblast, Paint & Hydrotest capabilities
- ASME Div. 1 & 2 Code Construction
- Structural Construction
- Assembly & Instrumentation
- PWHT Furnace
- Warehousing & Shipping by truck, rail and water
Odessa, Texas, USA
- 7,200 ft2 manufacturing area
- 5 acre yard
- Sandblast area
- Hydrotest capabilities
- ASME Div. 1 Code Construction
- Non-Code Construction
- Structural Construction
- Assembly & Instrumentation
- Field Service Capability
- Sales Office
- Warehousing & Shipping by truck
TEST Houston, Texas, USA
- 14,000 ft2 manufacturing area
- 0.25 acre yard
- Hydrotest capabilities
- Structural Construction
- Assembly & Instrumentation
- Warehousing
- Shipping by truck, rail and water
TEST Harvey, Louisiana, USA
- 10,000 ft2 manufacturing area
- 1 acre yard
- Hydrotest capabilities
- Assembly & Instrumentation
- Warehousing & Shipping by truck
Williston/Connor, North Dakota, USA
- 20,000 ft2 manufacturing area
- 19 acre yard
- Sandblast & Paint facilities
- Non-Code Construction
- Shipping accessibility by truck
Calgary, Alberta, Canada
- 70,5000 ft2 manufacturing area under roof
- 15 acre yard
- Sandblast area
- Paint booth/building
- Hydro Test capability
- ASME Div. 1 & 2 Code Construction
- Non-code construction
- Structural construction
- PWHT Furnace
- Assembly & Instrumentation
- Warehousing & Shipping by truck and rail
Saudi Arabia (Kingdom of)
- 102,000 ft2 manufacturing area
- 2 acre yard
- Sandblast area
- Hydro Test capability
- ASME Div. 1 & 2 Code Construction
- Non-code construction
- Structural construction
- Assembly & Instrumentation
- Warehousing & Shipping truck/rail